Blog

1806, 2021

3 CRITERIA TO KEEP IN MIND FOR YOUR NEXT PRE-PILING TEMPLATE

18/06/2021|Blog|

When installing an offshore wind turbine in 50-80 meter water depth, using a jacket foundation is an obvious choice. To install the pin-piles for the jacket, a pre-piling template is an excellent structure to ensure precise installation. Moving to new areas with different circumstances brings along new operational challenges. A few examples: Deeper water In 2015 the average water depth of offshore wind farms was 27 meters. The current wind farms under construction see water depths of 40 up to 50 meters. Deeper water means longer piles, which has a direct impact on the equipment involved. Increasing workability Piling frames ...

106, 2021

INCREASE WORKABILITY OF AN OFFSHORE TOOL WITH INNOVATION OR WITH ADDING SIMPLICITY?

01/06/2021|Blog|

Designing the most complex tool is never the issue. Design and build an innovative tool that increases workability, that is the challenge. Innovation is about being clever. Sometimes adding functionality and a higher level of automation to your tool is a clever way to increase workability. However, there are also situations in which innovation lies in a simplification of existing methods and equipment. SIMPLIFYING OPERATIONS In the last 20 years (yes, it is our anniversary year!), we have seen and delivered many different offshore tools. We have won the trust of our clients not only by making tools more ...

1105, 2021

HOW TO ENSURE FLAWLESS INTEGRATION OF A BOAT LANDING SYSTEM ON YOUR VESSEL

11/05/2021|Blog, Boat landing systems|

During offshore operations, crew changes are almost inevitable. Many offshore wind farm developers and oil and gas operators choose boat landing systems as the preferred way of crew transfer because of their high level of safety. If you want to integrate a new boat landing system into your vessel, you have to deal with many challenges. In this blog post, we share a few with you. Rules & Regulations When you look into the rules and regulations of a boat landing system, you easily can get lost. The guidelines differ depending on the project location or operator involved. Another ...

2402, 2021

KENC APPOINTS SINGAPORE AGENT

24/02/2021|Blog, News, Team|

On Wednesday 24th of February, KENC announced the appointment of Rene Birsak as their agent for the Singapore region. As part of KENC’s growth strategy, KENC has joined forces with Rene Birsak to expand its footprint in Singapore and surrounding countries. With over 30 years of offshore experience, Rene is a true professional. He left his role as vessel manager at Thome Group to start TCMO, a technical maritime and offshore consultancy. As an independent agent, Rene will be the extension of KENC in the Singapore region. Rene Birsak: “I am very happy to work together with KENC and leverage ...

2303, 2020

PROMOTION!

23/03/2020|Blog, News, Team|

Last month we’ve celebrated 2 promotions within the KENC Engineering BV team! As of the 1st of February Björn Nijenmanting has been promoted to Manager FEA. Cor Hilbrink will continue in the role of Manager Engineering. “Delivering complex equipment – often under time pressure – will only work with a great team. I’m very happy to work with the entire KENC team and pleased to share that Björn and Cor are able to make the next step in their career within the company." Eric Buining, managing director at KENC

Go to Top